On The Level with Gardner/Fox


Mariposa Coop Construction Update
November 4, 2011, 2:38 pm
Filed under: Community, Fit Out, Green Building, Philadelphia, Renovation, Retail

Mariposa Coop Sidewalk Construction Philadelphia, PA
The Mariposa Coop construction continues with evidence of a new sidewalk ramp and stairs in progress at the front door.

Mariposa Coop Sidewalk Construction Philadelphia, PA
At the rear entrance we are prepping for the new concrete pad. The window facing the street will become the loading dock with a lift gate and roll up door.

Mariposa Coop Cold Storage Drywall Construction Philadelphia, PA
The loading dock will open right up to the cold storage room. Here we can see that the drywall stage is in progress.

Mariposa Coop Drywall Prep Kitchen Construction Philadelphia, PA
The prep kitchen has been dry-walled also. All the electrical, HVAC and plumbing has been done behind the scenes.

Mariposa Coop Drywall & Construction Philadelphia, PA
Workers repair the wall surface in the main retail area.

Advertisement

1 Comment so far
Leave a comment

I can see the light and it looks. I am looking ahead to my next visit. Keep me plugged in and amped.

Comment by Bengi Wall




Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s



Follow

Get every new post delivered to your Inbox.

Join 115 other followers